Case Studies
ST JOHN’S SCHOOL, LEATHERHEAD
St John’s School is a fully co-educational Independent school. The school competes on a circuit across a wide variety of sports, and some pupils have gained representative honours at county,...
ST JOHN’S SCHOOL, LEATHERHEAD
St John’s School is a fully co-educational Independent school. The school competes on a circuit across a wide variety of sports, and some pupils have gained representative honours at county,...
View Case StudyREADING FC
The Bearwood Park site, set over almost 120 acres, hosts three full-size first-team pitches (with the same dimensions as the pitch at the Madejski Stadium), a floodlit artificial 3G pitch,...
READING FC
The Bearwood Park site, set over almost 120 acres, hosts three full-size first-team pitches (with the same dimensions as the pitch at the Madejski Stadium), a floodlit artificial 3G pitch,...
View Case StudySOUTHAMPTON FC ACADEMY
When Southampton FC were planning their new Longwood Training Ground facility Perform Better were selected to design and equip the new 1st Team Strength & Conditioning room.At the same time...
SOUTHAMPTON FC ACADEMY
When Southampton FC were planning their new Longwood Training Ground facility Perform Better were selected to design and equip the new 1st Team Strength & Conditioning room.At the same time...
View Case StudySOUTHAMPTON FC REHAB GYM
When the new Strength and Conditioning facility was completed the existing Gym facility was converted into a new Rehab gym for the Club’s Physiotherapy department. The existing turf flooring was...
SOUTHAMPTON FC REHAB GYM
When the new Strength and Conditioning facility was completed the existing Gym facility was converted into a new Rehab gym for the Club’s Physiotherapy department. The existing turf flooring was...
View Case Study