KINGSLEY SCHOOL, LEAMINGTON

Perform Better worked with The Kingsley School to transform their gym hall into an all purpose gym.

Overview

We installed a combination of wall mounted racks, a functional rig with additional lifting stations, a track, free weights section, selectorised kit and CV equipment.

The school wanted a new gym to provide the students and teachers at The Kingsley School a facility to excel their performance, enhance sport lessons to learn the fundamentals of training and making the gym a welcoming place for everyone. The facility can now accommodate all of the schools needs.

Equipment Installed: 

  • Standard Wall Mounted Racks x2
  • Bespoke Standard 4 Bay Rig
  • DAP
  • Combined Leg Extension/Leg Curl
  • Chest Press
  • Leg Press
  • Standard Adjustable Flat to Incline Bench x2
  • Bespoke Turf Track
  • Concept RowErg x4
  • Concept SkiErg x2
  • Spirit CT800+ x4
  • Olympic Rubber Discs and storage
  • Rubber Hex Dumbbells and racks
  • Wall Balls
  • Slam Balls
  • Flooring
Back to case studies

Sports Performance 2024 Catalogue

Download the Perform Better - Sports Performance Catalogue to view our full range of products.

Download Now

Who we've worked with

  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo