In 2020 Oxford United appointed Perform Better to upgrade their strength and conditioning facility, along with the match day warm up zone in the stadium.
Overview
Since 2001, Oxford United have played at the Kassam Stadium- the all-seater stadium has a capacity of 12,500 and has only three stands instead of the usual four; when first planned in 1995 it was originally going to have a 16,000-seat capacity, but by the time the stadium opened Oxford was playing in a lower division, so the smaller capacity was deemed adequate.
In 2018 Perform Better were selected to refurbish the Strength and Conditioning facility at the Club and supplied Three Standard Half Racks, Leg Press, Keiser bikes, Wattbikes, Treadmills and a range of Sport Science equipment. In 2020 the Club were keen to re-invest in the facility and added a Keiser Squat, new dumbbells, kettlebells and 10 more Keiser M3 spin bikes. With Perform Better being based only 50 minutes from Oxford the two parties have developed a commercial partnership which includes the S and C facility and Stadium Warm up area carrying Perform Better branding.
Equipment
- Keiser M3 Spin Bikes
- Keiser Squat
- Dumbbells
- Kettlebells
- Leg Press
- Standard Half Rack