Case Studies
A2B FOOTBALL ACADEMY
Perform Better kitted out a new facility in Chesterfield which provides an indoor pitch plus a large Strength and Conditioning space to develop young football players to help them to...
A2B FOOTBALL ACADEMY
Perform Better kitted out a new facility in Chesterfield which provides an indoor pitch plus a large Strength and Conditioning space to develop young football players to help them to...
View Case Study
EXETER COLLEGE
An elite S&C facility was installed at Exeter College as part of the Exeter Chiefs Rugby Academy programme to enhance student athletic performance, reduce injury risk, and support long-term physical development. The...
EXETER COLLEGE
An elite S&C facility was installed at Exeter College as part of the Exeter Chiefs Rugby Academy programme to enhance student athletic performance, reduce injury risk, and support long-term physical development. The...
View Case Study
ARDEN ACADEMY
Budget constraints are often a barrier for schools to invest in their gym spaces and equipment. By working with Perform Better, Arden Academy were able to phase their gym development...
ARDEN ACADEMY
Budget constraints are often a barrier for schools to invest in their gym spaces and equipment. By working with Perform Better, Arden Academy were able to phase their gym development...
View Case Study
THE HUB
The Hub is a private Performance centre based in Chepstow, Monmouthshire, with a full S&C Suite, Studio, Cardio area and Physio rooms. As part of an ongoing transformation of the facilities into the region’s...
THE HUB
The Hub is a private Performance centre based in Chepstow, Monmouthshire, with a full S&C Suite, Studio, Cardio area and Physio rooms. As part of an ongoing transformation of the facilities into the region’s...
View Case Study
BLACKBURN ROVERS FC
Perform Better have worked with Blackburn Rovers for a number of years and when the decision was made to refurbish the 1st team gym in 2025 PB were selected again to help design and...
BLACKBURN ROVERS FC
Perform Better have worked with Blackburn Rovers for a number of years and when the decision was made to refurbish the 1st team gym in 2025 PB were selected again to help design and...
View Case Study
HALLIFORD SCHOOL
The school identified a balcony area to be converted into a new gym for students. Due to their experience in designing and equipping independent school facilities Perform Better were selected...
HALLIFORD SCHOOL
The school identified a balcony area to be converted into a new gym for students. Due to their experience in designing and equipping independent school facilities Perform Better were selected...
View Case Study