TEESSIDE UNIVERSITY

Teesside University have recently built a new £2.75m Performance Strength and Conditioning facility for the University’s elite athletes and teams at their Middlesbrough campus. Perform Better were selected to supply Duraflex Performance Flooring for the whole area plus a Custom Infinity Rig with six lifting stations and a full range of Olympic Bars and Discs.

Back to case studies

Sports Performance 2024 Catalogue

Download the Perform Better - Sports Performance Catalogue to view our full range of products.

Download Now

Who we've worked with

  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo
  • logo