Case Studies
READING FC
The Bearwood Park site, set over almost 120 acres, hosts three full-size first-team pitches (with the same dimensions as the pitch at the Madejski Stadium), a floodlit artificial 3G pitch,...
READING FC
The Bearwood Park site, set over almost 120 acres, hosts three full-size first-team pitches (with the same dimensions as the pitch at the Madejski Stadium), a floodlit artificial 3G pitch,...
View Case StudyHUDDERSFIELD TOWN FC
Huddersfield Town FC developed a new 1st team training facility including a Strength training room and a warm up/cardio-vascular room. With Perform Better’s vast experience of designing and equipping Football...
HUDDERSFIELD TOWN FC
Huddersfield Town FC developed a new 1st team training facility including a Strength training room and a warm up/cardio-vascular room. With Perform Better’s vast experience of designing and equipping Football...
View Case StudyOXFORD UNITED FC
In 2020 Oxford United appointed Perform Better to upgrade their strength and conditioning facility, along with the match day warm up zone in the stadium. Overview Founded in 1893 as...
OXFORD UNITED FC
In 2020 Oxford United appointed Perform Better to upgrade their strength and conditioning facility, along with the match day warm up zone in the stadium. Overview Founded in 1893 as...
View Case StudyMANSFIELD TOWN FC
Mansfield Town Football Club is a professional football club based in the town of Mansfield, Nottinghamshire, England. Nicknamed ‘The Stags’. In 2019 they pushed through with plans to create a...
MANSFIELD TOWN FC
Mansfield Town Football Club is a professional football club based in the town of Mansfield, Nottinghamshire, England. Nicknamed ‘The Stags’. In 2019 they pushed through with plans to create a...
View Case StudyLINCOLN CITY FC
Lincoln City’s historic FA Cup run of 2016/17 has helped fund the build of a new £1.3 million Centre which houses a fully-equipped gym, changing rooms, canteen, offices and media...
LINCOLN CITY FC
Lincoln City’s historic FA Cup run of 2016/17 has helped fund the build of a new £1.3 million Centre which houses a fully-equipped gym, changing rooms, canteen, offices and media...
View Case StudyMORECAMBE FC
In the 2021-22 season Perform Better were approached by the Club to re-design and refurbish a gym space within Mixuma Stadium.
MORECAMBE FC
In the 2021-22 season Perform Better were approached by the Club to re-design and refurbish a gym space within Mixuma Stadium.
View Case Study